Posts Tagged ‘tilt up ston masonry’

14th May
2010
written by admin

1st wall forms = stripped
2nd wall forms = 60% complete (built on top of the 1st wall to save time while the first wall cures.)

(this post was delayed by a tech glitch)

ABOUT

an open (owner build) project

December 2019
S M T W T F S
« Aug    
1234567
891011121314
15161718192021
22232425262728
293031  
>