Posts Tagged ‘tilt up ston masonry’

14th May
2010
written by admin

1st wall forms = stripped
2nd wall forms = 60% complete (built on top of the 1st wall to save time while the first wall cures.)

(this post was delayed by a tech glitch)

ABOUT

an open (owner build) project

December 2022
S M T W T F S
 123
45678910
11121314151617
18192021222324
25262728293031
>