Posts Tagged ‘tilt up ston masonry’

14th May
2010
written by admin

1st wall forms = stripped
2nd wall forms = 60% complete (built on top of the 1st wall to save time while the first wall cures.)

(this post was delayed by a tech glitch)

ABOUT

an open (owner build) project

March 2019
S M T W T F S
« Aug    
 12
3456789
10111213141516
17181920212223
24252627282930
31  
>