Posts Tagged ‘tilt up ston masonry’

14th May
2010
written by admin

1st wall forms = stripped
2nd wall forms = 60% complete (built on top of the 1st wall to save time while the first wall cures.)

(this post was delayed by a tech glitch)

ABOUT

an open (owner build) project

June 2019
S M T W T F S
« Aug    
 1
2345678
9101112131415
16171819202122
23242526272829
30  
>