Our engineer said we are looking at only 7 day cure time before we can tilt up the walls. That’s great news.
At best, I was hoping for a 14 day cure time. We are poring 6bag mix with #5 grade 60 rebar 12 inches on center horizontally and vertically. 1 extra rebar around all openings. Wall thickness 8″ for concrete +1 for the stone protrusion.