Posts Tagged ‘the castle project’
We had ~50 tons of rock delivered for fill in our foundation.
Into the home stretch on laying stone for the first real wall for the castle project. For what will ultimately be called “the carriage house.” (My shop for cabinetmaking etc during the build phase).
Our local readymix plant of choice came through with a recomendation for two structural engineers in my local area. I emailed the one that wasn’t going to funnel the money out of the area to a major holding corporation. I received a response about 24 hours later and will plan to meet later in the week. I am guardedly optimistic.
ABOUT
an open (owner build) project
RECENT POSTS
S | M | T | W | T | F | S |
---|---|---|---|---|---|---|
1 | 2 | 3 | ||||
4 | 5 | 6 | 7 | 8 | 9 | 10 |
11 | 12 | 13 | 14 | 15 | 16 | 17 |
18 | 19 | 20 | 21 | 22 | 23 | 24 |
25 | 26 | 27 | 28 | 29 | 30 |
Stages/Disciplines
- Early Construction (23)
- Planning (25)
- Rough In (1)