Posts Tagged ‘compliance’
This week marks a major milestone for the castle project. we received our building permit (authorizing us to build by the stream) and a variance, allowing us to put our crossing in the creek during spawning season. (There are no gamefish in our stream).
So things will start fast-tracking now. I start putting in the crossing today and have 72 hours to finish it. (shouldn’t be a problem).
Once that is in, the well driller can come drill our well, and the electric co can come activate our power. After those are done, we can start excavation for the foundation.
And so the snowball is at the edge ready to start down the hill.
We got the ok to dig after a site inspection today. In our state if you dig before you call the inspectors and you damage a utility, you are liable. So like a good boy I called them on fri. They showed up today and marked the site “ok”. So I promptly stuck a shovel in my teeth and dug for all I was worth. (Either that, or I hopped on our kubota B21 and dug it like a normal person would).
I dug the ditch for the entrance cable for our underground service power cable.
ABOUT
an open (owner build) project
RECENT POSTS
S | M | T | W | T | F | S |
---|---|---|---|---|---|---|
1 | 2 | 3 | 4 | |||
5 | 6 | 7 | 8 | 9 | 10 | 11 |
12 | 13 | 14 | 15 | 16 | 17 | 18 |
19 | 20 | 21 | 22 | 23 | 24 | 25 |
26 | 27 | 28 | 29 | 30 | 31 |
Stages/Disciplines
- Early Construction (23)
- Planning (25)
- Rough In (1)